Item Coversheet
 AGENDA ITEM SUMMARY 

Recommendation to Authorize Participation in the Choice Partners National Purchasing Cooperative and Award the Al Larson Prairie Center for the Arts Lobby Remodeling Project to BEAR Construction Company
10/22/2024
Village Board Meeting

Presenter: Mark Rysavy, Facilities Division Manager
Lead Department:Engineering and Public Works
Accounts(s):Budget: Expense Request: 
 6809010-7401 (25022-20-230)$125,000.00$125,000.00
 6809010-7401 (24013-20-230)$120,000.00$4,600.02
Amount :  $115,399.98

If amount requested is over budget, a detailed explanation of 
what account(s) the overage will be charged to will be provided 
in the Executive Summary or attached detail. 
Executive Summary: 
 

The FY 24/25 CIP includes two projects for the Prairie Center for the Arts (PCA) to upgrade the interior finishes and theatre lobby area. The first is identified as the Theatre Sound/Light Project meant to provide sound and light separation from the lobby area into the theatre during performances. Staff developed construction drawings for modified walls, doors, and curtains at the entry to the theatre. Additionally, a permanent concession stand is proposed for the lobby.  The design is included with this agenda item.

 

The contract for the construction of the walls, doors and concession modifications was priced through a purchasing cooperative with BEAR Construction. The work includes several trades that need to be coordinated including carpentry, electric, plumbing, millwork, painting, and door hardware contractors. BEAR Construction provided a cost of $129,600 to complete all the work on the design drawings except the flooring and baseboards. The flooring scope will be accomplished by a different contractor. There are two accounts for the two projects. The total cost of both lobby projects are under the total budgeted amount. 

 

 

 

In FY 23/24, BEAR Construction completed the roof structure replacement at Well Station 15 that included many of the same trades as required for this project. Staff was very happy with the management of that project and is confident they can replicate those efforts at the PCA. The timeframe for completion of this work is limited, having to be completed between December 23rd and January 16th in order to not impact the PCA schedule. BEAR Construction offers the Village the best opportunity to meet those restrictive timelines. For these reasons, Staff recommends the construction portion of the PCA lobby remodel to BEAR Construction through the Choice Partners Cooperative.  

 Recommended Action:
 

The Village Manager recommends that the Engineering and Public Works Committee recommend the Village Board authorize participation in the Choice Partners National Purchasing Cooperative Contract #23/016MR-05 and award the Prairie Center for the Arts Lobby Remodel to BEAR Construction Company of Rolling Meadows, IL, in the amount of $129,600.02.

 